HYDROTEST PROCEDURE OF HEAT EXCHANGER AT SITE. Can anyone please point me to a source for determining the correct procedure for hydrotesting the various types of heat exchangers? Thanks. ASME Pressure vessel/ Heat Exchanger Hydrostatic test (for Internal Another method to find out the minimum test pressure is using the MAP.

Author: Faushicage Kekus
Country: Czech Republic
Language: English (Spanish)
Genre: Marketing
Published (Last): 25 February 2014
Pages: 494
PDF File Size: 10.86 Mb
ePub File Size: 11.32 Mb
ISBN: 112-6-66392-460-1
Downloads: 23973
Price: Free* [*Free Regsitration Required]
Uploader: Sagar

Heat Exchanger Hydrotesting Procedures We do air tests on the individual tubes to identify leaking tubes. The test pressure shall be held for at least 30 minutes. Leak rates vary inversely with fluid viscosity.

Download Now White Paper: Join your peers on the Internet’s largest technical engineering professional community. Hydrotest Procedure Ball Valve.

That was done by subcontractor with special devices with given instructions i. Resources Digital Transformation may be defined in a number of different ways by analysts or enterprise software vendors. For constructions in which the Authorized Inspector cannot visibly examine the shell sides of tubesheets, heat exchanger users are cautioned that pressure loss to determine whether there are leaks from the channel into the shell does not indicate weeping through the tube-to-tubesheet joints because the gages in common use are not sufficiently sensitive to indicate a pressure loss that discloses such small leaks.

After exchanber we do hydrotesting. I don’t have proceduee source, but I’ve done it many times on differet HeatX’s. This is especially so when the tube side hydrostatic test pressure is substantially higher than that of bydrotest shell side.

Except for leakage that might occur at temporary test closures for those openings yydrotest for welded connections, leakage is not allowed at the time of the required visual inspection. It’s easy to join and it’s free. Figure 1 Such testing has beneficial effects on the structure in addition to possibly cracking subsurface porosity bubbles and disclosing cracks in the welds. Posting Guidelines Promoting, selling, recruiting, coursework and thesis posting is forbidden.

  CATALYTIC REACTOR DESIGN TARHAN PDF

Digital Transformation may be defined in a xechanger of different ways by analysts or enterprise software vendors. Therefore, typical feedwater heater procurement specifications require helium leak sniffer testing mass spectrometer testing the exchanegr joints during manufacture. Hydrotest medium for SS sxchanger should be DM water. Defense manufacturing is all about project manufacturing and project accounting. For tubes welded to the tubesheet and subsequently expanded, the prudence suggests that in addition to such leak testing the welds should be fluid penetrant examined.

Remember me Forgot password?

Heat Exchanger Hydrotesting Procedures – Chemical plant design & operations – Eng-Tips

Some Manufacturers use strip chart or circular recording gages but the graduations are similar to those of dial gages. How should users deal with the possibility of such leaks? What type are you planning to test? But many such exchangers have been Code stamped and this practice continues throughout the industry. We need your help! See Table 1 for typical test pressures and pressure gage graduations.

Heat Exchanger Hydrotesting Procedures We have done already two turnarounds and we fairly know which heatexchangers give trouble. This is done after pulling and cleaning.

HYDROTEST PROCEDURE

If the exchanger service is for a fluid less viscous than water the likelihood of leakage in services may be very high if the Manufacturer relies on changes in the pressure gage reading to assess whether there is leakage from the channel side into the shell during hydrostatic testing. Promoting, selling, recruiting, coursework and thesis posting is forbidden. Users should be aware of these facts.

This is a very effective way to disclose leaking tube-to-tubesheet joints. Hydrotest Dan Pneumatic Test. As far as I know that the hydrotest by air is safety concern and water procedkre usually used.

I have developed standard procedures for overhauling heat exchangers such as found in oil refineries and chemical plants. Users must recognize the hazards of process fluids leaking from the channel into the shell and where hazards exist, specify further leak testing as described in Section V of the Code.

  GNOME HUMAN INTERFACE GUIDELINES 2.2.3 PDF

It demonstrates that relying on gage indication of pressure loss to assess leaks weeping that would not be visible during hydrostatic testing does not indicate whether there are such small leaks. Your consent to our cookies if you continue to use this website. Download Now Defense manufacturing is all about project manufacturing and project accounting. It is necessary to understand the service of the exchanger and the degree of hazard such leakage presents. For flanged joints at inlet and outlet should be tested with service gaskets.

Therefore, when they hydrostatically test the tube side, they rely on pressure loss in the tubes and channel during the holding period to indicate leakage through the tube-to-tubesheet joints. The Code excnanger a pressure containment safety code and the hydrostatic test represents only a test adequate for the typical heat exchanger not in a specific service where leakage is an issue. Heat Exchanger Hydrotesting Procedures As far as I know that the hydrotest by air is safety concern and water is usually used.

exchangre

Keep the pressure for 1 hour. Seams then bring it to the notice of PMC before proceeding with further action. Open vent and drain. For such equipment small leaks of high-pressure feedwater through the tube-to-tubesheet joints leads to wire drawing wormholingwhich when severe can be extremely expensive to repair, especially when considering the loss of cycle efficiency when the heater is bypassed to allow access for repairs.

It is easier to test then pressure testing in the shell with water to find leaking tubes. Severe wormholing can shorten feedwater heater life.